---
title: "Management review minutes for ISO 27001, with a template"
canonical: "https://auditbadger.com/blog/management-review-minutes-for-iso-27001-with-a-template/"
last-updated: "2026-10-05"
---

# Management review minutes for ISO 27001, with a template

By Maciej • Published 2026-11-04 • 7 min read • Categories: ISO, Compliance Governance, Evidence Collection

Created with AI assistance. AuditBadger retains editorial control and responsibility.

**TL;DR:** An ISO 27001:2022 management review must be held by top management at planned intervals (9.3.1), consider every input in 9.3.2 (status of previous actions, changes in external and internal issues, changes in needs and expectations of interested parties, which was added in 2022, information security performance trends, feedback from interested parties, risk assessment results and treatment plan status, and improvement opportunities), and produce decisions on improvements and changes to the ISMS backed by documented evidence (9.3.3). The easiest way to pass is to build the agenda in the standard&#39;s own order, prepare inputs before the meeting, and use minutes that keep a section for every input even when the answer is no change. Auditors look for decisions with a reason, an owner and a date, and for last year&#39;s actions being followed up this year. The usual nonconformities are a missing input (often c or f), minutes with no decisions, no follow-up of previous actions, no top management present, and a missed interval. Smaller meetings such as security committees and incident post-mortems also count as evidence once they are linked to the controls, risks or corrective actions they support.

An ISO 27001 management review needs three things to survive an audit: an agenda that covers every input listed in clause 9.3.2, decisions about improvement and changes to the ISMS (clause 9.3.3), and minutes that prove both happened. Below is an agenda mapped one-to-one to the standard, a minutes template you can copy, and the mistakes that turn a perfectly good meeting into a nonconformity.

If you want the theory of clause 9 first, we covered it in [ISO 27001 clause 9: performance evaluation, internal audit and management review](/blog/iso-27001-clause-9-performance-evaluation-monitoring-internal-audit-and-management-review/). This post is the practical artifact.

## What does clause 9.3 actually require?

Clause 9.3 of ISO 27001:2022 has three parts.

- **9.3.1 General.** Top management reviews the ISMS at planned intervals to make sure it is still suitable, adequate and effective.
- **9.3.2 Management review inputs.** The review has to consider a fixed list of inputs, a) to g), listed below.
- **9.3.3 Management review results.** The results include decisions on continual improvement opportunities and any needed changes to the ISMS, and documented information has to be available as evidence of those results.

The inputs in 9.3.2:

1. The status of actions from previous management reviews.
2. Changes in external and internal issues relevant to the ISMS.
3. Changes in needs and expectations of interested parties relevant to the ISMS. (New in the 2022 edition, and the one most often forgotten by teams working from a 2013 template.)
4. Feedback on information security performance, including trends in nonconformities and corrective actions, monitoring and measurement results, audit results, and fulfilment of information security objectives.
5. Feedback from interested parties.
6. Results of risk assessment and the status of the risk treatment plan.
7. Opportunities for continual improvement.

&quot;Planned intervals&quot; is up to you. Most small companies hold one full review a year, often a few weeks before the certification or surveillance audit, plus lighter check-ins in between. Write the interval down and stick to it. A review that was planned for March and happened in September is a finding waiting to be written.

## A management review agenda mapped to the inputs

Use the standard&#39;s own order. It makes the minutes easy to check, and auditors read faster when they can tick down a list they already know.

| Agenda item | Clause 9.3.2 | Bring to the meeting |
| --- | --- | --- |
| 1. Actions from the last review | a) | Last review&#39;s action list with owner, due date and status |
| 2. Changes in context | b) | New products, markets, office moves, reorganizations, regulatory changes, new major suppliers |
| 3. Changes in interested parties | c) | New customer security requirements, contract clauses, regulator expectations, staff expectations |
| 4. Security performance | d) | Nonconformity and corrective action log, metrics, internal and external audit results, status of security objectives |
| 5. Feedback from interested parties | e) | Customer security questionnaires and complaints, auditor remarks, staff feedback |
| 6. Risk | f) | Latest risk assessment results and risk treatment plan status |
| 7. Improvement opportunities | g) | Ideas from the team, lessons from incidents and post-mortems |
| 8. Decisions and actions | 9.3.3 | Decisions on improvements, changes to the ISMS, resources, owners and dates |

For a ten person company this fits in about an hour if the inputs are prepared in advance. If preparation is happening live in the meeting, the meeting will run long and the minutes will be thin. Prepare first.

## A minutes template you can copy

Paste this into your document tool, keep one copy per review, and do not delete sections that had nothing to report. &quot;No changes&quot; is an answer. A missing section is a gap.

&gt; **ISMS management review minutes**
&gt; 
&gt; Date: [date]. Planned interval: [annual / semi-annual]. Review period: [from] to [to].
&gt; 
&gt; Attendees: [names and roles, including at least one member of top management].
&gt; 
&gt; **a) Actions from previous review:** [each action, owner, status: done / in progress / dropped with reason].
&gt; 
&gt; **b) Changes in external and internal issues:** [what changed, or &quot;no relevant changes&quot;].
&gt; 
&gt; **c) Changes in needs and expectations of interested parties:** [what changed, or &quot;no relevant changes&quot;].
&gt; 
&gt; **d) Information security performance:** nonconformities and corrective actions [summary and trend]; monitoring and measurement [key results]; audit results [internal and external]; security objectives [status of each].
&gt; 
&gt; **e) Feedback from interested parties:** [summary].
&gt; 
&gt; **f) Risk assessment and treatment:** [results of latest assessment, status of the risk treatment plan].
&gt; 
&gt; **g) Opportunities for continual improvement:** [list].
&gt; 
&gt; **Decisions:** [decision, rationale].
&gt; 
&gt; **Changes to the ISMS:** [scope, policies, objectives, resources, or &quot;none&quot;].
&gt; 
&gt; **Actions:** [action, owner, due date].
&gt; 
&gt; Approved by: [name, role, date].

## What decisions do auditors like to see?

The single most common weakness in management review minutes is that nothing was decided. The inputs were read out, everyone nodded, the meeting ended. Clause 9.3.3 asks for decisions, so record them, even small ones. A few examples of the kind of thing that reads well:

- &quot;Access reviews moved from annual to quarterly after two leavers kept access past their last day. Owner: CTO, first review by [date].&quot;
- &quot;Risk R-14 (single person with production database access) accepted until [date], when a second engineer is onboarded. Reassess at next review.&quot;
- &quot;New security objective added: all customer-facing services behind SSO for staff by [date].&quot;
- &quot;Budget approved for an external penetration test in [quarter].&quot;
- &quot;Scope unchanged. The new marketing site is out of scope because it holds no customer data; recorded in the scope statement.&quot;

Notice the pattern: a decision, a reason, an owner, a date. That is what makes the next review&#39;s item a) possible, and it is what an auditor follows from one year&#39;s minutes to the next.

## Other meetings count too (if you link them)

The annual review is not the only meeting that produces evidence. A security committee that meets monthly, an incident post-mortem, a quarterly risk session: all of them show the ISMS is being run, not just documented. The problem is that their notes usually sit in a calendar invite or a shared doc nobody can find at audit time.

Two habits fix most of it:

- Record what each meeting supports. &quot;This post-mortem fed corrective action CA-7 and risk R-22&quot; turns a meeting note into evidence for clause 10 and for risk treatment.
- Feed the smaller meetings into the annual review. The post-mortem from May becomes input d) or g) in the next management review. Corrective actions from those meetings are covered in [ISO 27001 clause 10: nonconformities and corrective action](/blog/iso-27001-clause-10-improvement-nonconformities-and-corrective-action/).

## Common nonconformities in management reviews

- **Missing inputs.** Usually c), because it was added in 2022, or f), because the risk treatment plan lives with someone who was not invited.
- **No decisions.** Minutes that summarize but never decide do not meet 9.3.3.
- **No follow-up.** Last year&#39;s actions are not mentioned this year, so a) is effectively empty.
- **Top management absent.** If the review is run by the person who also runs the ISMS day to day, with no one from leadership, it is a team meeting, not a management review.
- **Interval not respected.** The planned interval was annual and the last review was nineteen months ago.

None of these is about the quality of your security. They are all about the paperwork not showing what happened. Which is good news: they are cheap to fix.

## How we handle this in AuditBadger

The management review lives in the ISMS workbook, which covers clauses 4 to 10. It enforces the required inputs, so a review cannot be completed with one of a) to g) quietly skipped. More on the workbook in [introducing the ISMS workbook](/blog/introducing-the-isms-workbook-the-iso-27001-requirements-nobody-told-you-about/).

For the other meetings there is Compliance History: one timeline for meetings, notes and milestones alongside your formal management reviews. Each record can be linked to the controls, risks, requirements or documents it supports, so in the audit it is obvious what a given meeting backs up. You can paste your notes or upload a transcript and get a draft record prepared, and nothing is added to the official history until you review and confirm it. When the auditor asks, you export the records with their linked evidence as a package.

The judgment stays with you. The tool will not decide whether a risk is acceptable or what your next objective should be. It makes sure that when you have decided, the decision is written down, linked and findable. If you are preparing for an [ISO 27001](/iso27001/) certification, that is most of what the auditor wants from clause 9.3.

